PUBLIC NOTICE No. 15/2021
New Delhi, Dated 27th September 2021
ATTENTION TO ALL NEW INFRASTRUCTURE PROJECTS
Whereas the Central Government constituted the Central Ground Water Authority
(hereinafter referred to as the Authority) vide notification Number S.O. 38(E), dated 14th
January, 1997, followed by notification number S.O. 1124(E) dated 6th November, 2000
and S.O. 1121 (E) dated 13th May, 2010 of the Government of India in the Ministry of
Environment & Forests, for the purposes of regulation and control of ground water
development and management in the whole of India and to issue necessary regulatory
directions.
And whereas the Authority has issued ‘Guidelines to control and regulate ground water
extraction in India’ vide notification number 3289(E) dated 24th September, 2020,
wherein Section 17 stipulates the conditions mandatorily to be followed by the project
proponents.
This is to bring to the notice of all concerned that:
1. In all new infrastructure projects, open paved/parking area must be covered with
interlocking/perforated tiles or other suitable measures to ensure rainwater runoff
infiltration/harvesting.
2. All new infrastructure projects shall install dual water supply system for utilizing
STP treated water for flushing.
3. Non-compliance of these conditions shall attract penal provision as per Section
15 of Environment (Protection) Act, 1986.
Member Secretary
CGWA
Government of India
Ministry of Jal Shakti
Department of Water Resources, River Development & Ganga Rejuvenation
Central Ground Water Authority
PUBLIC NOTICE No. 15/2021 New Delhi, Dated 27th September 2021
ATTENTION TO ALL NEW INFRASTRUCTURE PROJECTS
Whereas the Central Government constituted the Central Ground Water Authority (hereinafter referred to as the Authority) vide notification Number S.O. 38(E), dated 14th January, 1997, followed by notification number S.O. 1124(E) dated 6th November, 2000 and S.O. 1121 (E) dated 13th May, 2010 of the Government of India in the Ministry of Environment & Forests, for the purposes of regulation and control of ground water development and management in the whole of India and to issue necessary regulatory
directions.
And whereas the Authority has issued ‘Guidelines to control and regulate ground water
extraction in India’ vide notification number 3289(E) dated 24th September, 2020,
wherein Section 17 stipulates the conditions mandatorily to be followed by the project
proponents.
This is to bring to the notice of all concerned that:
1. In all new infrastructure projects, open paved/parking area must be covered with
interlocking/perforated tiles or other suitable measures to ensure rainwater runoff
infiltration/harvesting.
2. All new infrastructure projects shall install dual water supply system for utilizing
STP treated water for flushing.
3. Non-compliance of these conditions shall attract penal provision as per Section
15 of Environment (Protection) Act, 1986.
Member Secretary
CGWA